Hydraulic Assessment of Suspended Sediment, Penang, Oct 2007
Authors
Abstract
-To collect and analysis the existing environmental parameters within the water regime to the north as well as north-western of Penang Island. This include the water regime surrounding Teluk Bahang, the headland of Muka Head and around Kampung Pantai Acheh, which llies to the north-western side of the island.-To establish the hydrodynamics in the water body around Penang Island-To establish the extend of dispersion of suspended sediment solids originating from the designated disposal site for the No-wind and with-wind conditions during both spring and neap tidal conditions.-To assess the possible impacts that could rise due to the fate of sediment dispersion as a result of the dumping activities to the shoreline of Penang Island.-To suggest, where possible, remedial measures to minimize any potential adverse impacts as a consequence of dumping activities generated by the dredging operations in the North Channel and approaches to NBCT and Butterworth Wharves.
Legacy Gedung metadata
- Original report name
- Sixth Maintenance Dredging of the North Channel and Approaches to the North Butterworth Container Terminal (NBCT) and the Butterworth Wharves, Penang - Hydraulic Assessment of Suspended Sediment Dispersion from the Disposal Site to the North of Penang Isl
- Prepared by
- Coastal and Offshore Engineering Institute, UTM
- Report owner
- Penang Port Sdn Bhd
- Type of report
- Assessment
- Geographical location
- North of Penang Island
- Geographical reference
- Peninsular Malaysia: Pulau Pinang: Seberang Perai Utara, Penang
- River Basin Management Unit (RBMU)
- Peninsular Malaysia RBMU:RBMU 06: Perai
- Additional information
- Shore Reaches:
Shore Line: West Coast Shoreline
Reach: Reach 3W2 - North Coast of Pulau Pinang - Price
- Free
- Legacy record created
- 11/27/2014 11:53:05 AM
- Legacy record modified
- 12/27/2018 12:22:34 PM
- Source workbook
- Coastal_Engineering.xlsx, row 14
Citation
No citation record supplied.