Utilising Physical Model for Design Assessment: Proposed Alterations of Batu Dam, Malaysia

Physical model was utilised to make an assessment of Batu Dam spillway, as well as to make informed recommendations of its hydraulic performance and proposed alterations. A scale of 1:25 was chosen for the model for optimum configuration. Simulations with respect to various reservoir levels and discharges to investigate effects of the varied flow conditions were performed. The experiments were run at ten discharge flows under two different conditions, with and without the proposed overflow weir at the inlet. It was found that the transition portion and the spillway chute are adequate for the proposed design discharge but the energy dissipater is insufficient to cater for the high discharge. The proposed overflow weir was not found to have any benefits in terms of controlling high flows equivalent or greater than 64 l/s as there is no significant difference in the results when compared to test conditions without the overflow weir installed.

Language: English
Document code: 8704db27-709d-11ed-a315-fa163eda1aa9
Research Area: Physical Modelling
Published Year: 2020
DOI: 10.7763/IJET.2016.V8.885
ISBN / ISSN: 1793-8236

Authors

SAIFUL BAHRI HAMZAHMOHD KAMARUL HUDA SAMION

Abstract

Physical model was utilised to make an assessment of Batu Dam spillway, as well as to make informed recommendations of its hydraulic performance and proposed alterations. A scale of 1:25 was chosen for the model for optimum configuration. Simulations with respect to various reservoir levels and discharges to investigate effects of the varied flow conditions were performed. The experiments were run at ten discharge flows under two different conditions, with and without the proposed overflow weir at the inlet. It was found that the transition portion and the spillway chute are adequate for the proposed design discharge but the energy dissipater is insufficient to cater for the high discharge. The proposed overflow weir was not found to have any benefits in terms of controlling high flows equivalent or greater than 64 l/s as there is no significant difference in the results when compared to test conditions without the overflow weir installed.

Citation

SAIFUL BAHRI HAMZAH, MOHD KAMARUL HUDA SAMION. 2020. Utilising Physical Model for Design Assessment: Proposed Alterations of Batu Dam, Malaysia. Digital NAHRIM Publication Repository.