MASTER PLAN STUDY OF CONJUNCTIVE WATER SUPPLY SYSTEM FOR FEDERAL TERRITORY OF KUALA LUMPUR

The Master Plan Study of Conjunctive Water Supply System for the Federal Territory of Kuala Lumpur assessed the potential of alternative water resources (AWR) to supplement conventional supply and strengthen urban water security. The study evaluated five resource categories—rainwater harvesting, stormwater from flood detention ponds, groundwater, treated wastewater and river low flow diversion—across six planning zones. Resource yield assessment was integrated with water demand estimation, water quality and treatment evaluation, engineering planning, and financial and socioeconomic assessments. The study identified an initial AWR potential of 1,018.78 million litres per day (MLD) and recommended a practical yield of 842.22 MLD. The practical allocation comprises 533.09 MLD for potable supply following treatment, 297.54 MLD for industrial reuse and 11.59 MLD for supplementary domestic rainwater supply. Compared with estimated demand excluding non-revenue water, the practical portfolio is equivalent to 101.4% of the 2021 demand of 831 MLD and 89.7% of the projected 2030 demand of 939 MLD. These comparisons represent aggregate resource potential across different end uses, subject to treatment, distribution and operational requirements. The proposed master plan comprises six water supply schemes and associated variants, a Batu Pond pilot concept, and potential transfers to existing treatment facilities. A hybrid centralised and decentralised approach, supported by sustainable groundwater management and potential aquifer storage and recharge measures, is recommended to diversify supply, strengthen supply reserves and improve resilience to drought, climate variability and urban water disruptions. Document Availability The document provided for download is the Executive Summary, presenting the study’s principal findings, proposed master plan and recommendations. The full Final Report and accompanying appendices contain extensive technical analyses and supporting information and are available upon request from NAHRIM, as their file sizes exceed the scope of this downloadable summary.

Language: English
Document code: 6bede690956c3100af2a495d97318a08
Research Area: Water Resources
Published Year: 2022
DOI: —
ISBN / ISSN: —

Authors

IR. MARINI MOHAMAD IDERIS · CorrespondingIr. Mohd Zaki bin Mat AminDato’ Ir. Dr. Md Nasir Md NohIsmail Hj. TawnieTs. Dr. Zati SharipNoor Hisham bin Ab GhaniMohd Fadhil KasimGOH YEE CAINUR ELYASABATH MOHD GHAZALIHJ. ANUAR SEFIEDr. Wong Wai SamProf. Dr. Zulkifli YusopDr. Siti Falindah PadleeDr. Mohd Sofiyan Sulaiman

Abstract

The Master Plan Study of Conjunctive Water Supply System for the Federal Territory of Kuala Lumpur assessed the potential of alternative water resources (AWR) to supplement conventional supply and strengthen urban water security. The study evaluated five resource categories—rainwater harvesting, stormwater from flood detention ponds, groundwater, treated wastewater and river low flow diversion—across six planning zones. Resource yield assessment was integrated with water demand estimation, water quality and treatment evaluation, engineering planning, and financial and socioeconomic assessments. The study identified an initial AWR potential of 1,018.78 million litres per day (MLD) and recommended a practical yield of 842.22 MLD. The practical allocation comprises 533.09 MLD for potable supply following treatment, 297.54 MLD for industrial reuse and 11.59 MLD for supplementary domestic rainwater supply. Compared with estimated demand excluding non-revenue water, the practical portfolio is equivalent to 101.4% of the 2021 demand of 831 MLD and 89.7% of the projected 2030 demand of 939 MLD. These comparisons represent aggregate resource potential across different end uses, subject to treatment, distribution and operational requirements. The proposed master plan comprises six water supply schemes and associated variants, a Batu Pond pilot concept, and potential transfers to existing treatment facilities. A hybrid centralised and decentralised approach, supported by sustainable groundwater management and potential aquifer storage and recharge measures, is recommended to diversify supply, strengthen supply reserves and improve resilience to drought, climate variability and urban water disruptions. Document Availability The document provided for download is the Executive Summary, presenting the study’s principal findings, proposed master plan and recommendations. The full Final Report and accompanying appendices contain extensive technical analyses and supporting information and are available upon request from NAHRIM, as their file sizes exceed the scope of this downloadable summary.

Citation

APA 7: National Water Research Institute of Malaysia (NAHRIM). (2021). Master plan study of conjunctive water supply system for the Federal Territory of Kuala Lumpur: Final report.